Custom Door Buyer Beware: Do Not Rush Your Purchase

Learn how to avoid costly mistakes, recognize warning signs, and ensure a smooth experience when ordering custom doors for your home. Patience and research are your best allies.

Ordering a custom door is exciting—but rushing the process is the fastest path to disappointment. Custom doors represent a significant investment, often $3,000 to $30,000 or more, with lead times stretching 8 to 20 weeks. Unlike off-the-shelf products, mistakes with custom orders are costly, difficult to correct, and can derail your entire renovation timeline. This guide will help you navigate the custom door buying process, recognize red flags, and avoid the most common pitfalls that leave homeowners frustrated and out of pocket.
⏱️
8-20 Weeks
Typical Lead Time
💰
50%
Typical Deposit
📋
3+ Quotes
Minimum to Compare
⚠️
35%
Have Issues

Why Patience Matters in Custom Door Purchases

The custom door industry operates differently than retail shopping. When you order a custom door, you're commissioning a handcrafted product built specifically for your home. This fundamental difference means the stakes are higher—and so is the importance of taking your time.

No Returns or Exchanges

Unlike stock doors from a home improvement store, custom doors are made to your exact specifications. If you change your mind or make an error, there's no returning it. The door is yours—right or wrong.

Large Financial Commitment

Most custom door companies require 50% deposits upfront, sometimes more. Once that money is paid, you have limited leverage if problems arise. Rushing into a deposit before doing research is risky.

Long Lead Times

Production takes 8-20 weeks, sometimes longer. If you rush and end up with the wrong company, you've lost months—and may need to start over from scratch with someone else.

Complex Customization

Custom doors involve dozens of decisions: materials, dimensions, finishes, hardware, glass options, and more. Rushing through these choices leads to doors that don't match your vision or home.

The Rush Mentality Trap

Many homeowners rush custom door purchases because:

  • They're excited about their renovation and want to see progress
  • A contractor is pressuring them to finalize selections
  • They found a "sale" or "limited time discount"
  • They underestimate how long the process takes

Every one of these scenarios has led to regret. Take a breath. A few extra weeks of research can save you thousands of dollars and months of frustration.

Most Common Problems When Ordering Custom Doors

Understanding what can go wrong helps you prevent it. These are the issues we hear about most often from homeowners who wished they'd been more careful.

1. Measurement Errors

The number one cause of custom door disasters is incorrect measurements. Custom doors are built to the exact dimensions you provide—if those dimensions are wrong, the door won't fit. This can happen when:

  • Homeowners measure themselves without understanding proper door measurement techniques (rough opening vs. finished opening)
  • Measurements are taken too early before framing or finishing work is complete
  • Communication errors between the homeowner, contractor, and door company
  • Assuming standard sizes when your opening is actually non-standard
Measurement Best Practice

Always have the door company send their own professional to measure your opening, and get this measurement in writing as part of your contract. If they guarantee their measurements, you have recourse if something goes wrong.

2. Design Miscommunication

What you envision and what the fabricator builds can be surprisingly different. This happens when:

  • Vague descriptions like "traditional style" or "modern look" are used without specific references
  • No formal drawings are provided or approved before production
  • Finish samples aren't reviewed before final decisions are made
  • Glass type isn't specified clearly—clear, frosted, textured, or decorative can look very different

3. Quality Issues

Some custom door companies cut corners on materials or craftsmanship. Common quality problems include:

  • Substandard materials that look fine initially but deteriorate quickly
  • Poor finish application leading to peeling, cracking, or fading
  • Weak joinery that causes doors to warp, sag, or separate over time
  • Inadequate weatherstripping resulting in drafts and water infiltration
  • Hardware that doesn't function properly or fails prematurely

4. Delivery and Timeline Failures

Custom doors often arrive late, damaged, or both. Timeline issues to watch for:

  • Unrealistic promises—be skeptical of anyone promising faster-than-normal lead times
  • No communication about production progress or delays
  • Shipping damage due to inadequate packaging or poor carrier choice
  • Partial deliveries where the door arrives but hardware, sidelights, or other components don't

5. Installation Problems

Even a perfectly made door can be ruined by poor installation:

  • Installers unfamiliar with the specific door type—iron doors, pivot doors, and specialty doors require expertise
  • Improper shimming and leveling leading to doors that stick or don't seal properly
  • Damage during installation from careless handling
  • Missing or incorrect installation hardware that holds up the project

Red Flags: Warning Signs of a Problematic Vendor

Before you commit to any custom door company, watch for these warning signs that suggest potential trouble ahead.

High-Pressure Sales Tactics

Any company pushing you to sign immediately, offering "today only" discounts, or making you feel rushed is a major red flag. Reputable companies understand custom purchases take time and never pressure you. Walk away from high-pressure situations.

No Physical Showroom or Samples

Companies that can't show you physical examples of their work—even if just finish samples or hardware—may not have the experience they claim. For high-dollar purchases, seeing is believing. Request to visit completed installations or their workshop.

Vague or Missing Contract Terms

If the contract doesn't clearly specify materials, dimensions, finishes, timeline, payment terms, and warranty, don't sign. Verbal promises mean nothing when disputes arise. Everything must be in writing with specific details.

Unusually Low Prices

If one quote is dramatically lower than others, ask why. Either they're cutting corners on materials, outsourcing to unknown fabricators, or baiting you with a low price that will increase with "necessary upgrades." Quality custom work has consistent market rates.

Demanding Full Payment Upfront

Standard practice is 50% deposit with the balance due before or upon delivery. Any company demanding 100% upfront is taking on none of the risk—and leaving you fully exposed. Never pay in full before receiving your door.

Negative Reviews or No Reviews

Check Google, Yelp, BBB, and Houzz for reviews. Patterns of complaints about quality, timelines, or customer service are serious warnings. No reviews at all for an established company is also suspicious—they may be hiding a problematic history.

Questions That Reveal Vendor Quality

Ask these questions and pay attention to how vendors respond:

  • "Can I visit your workshop?" Legitimate manufacturers are proud to show their facility. Hesitation suggests they're a broker, not a maker.
  • "Who actually makes the doors?" Many companies resell doors made overseas. Knowing the actual source matters for quality and service.
  • "What happens if I'm not satisfied?" Listen for specific policies, not vague reassurances. How do they handle complaints and defects?
  • "Can I speak with recent customers?" Good companies have happy customers willing to share their experience.
  • "What's your warranty and what does it cover?" Specifics matter—"lifetime warranty" often has significant exclusions.

Proper Due Diligence Before Purchasing

Taking time upfront prevents problems later. Here's a systematic approach to vetting custom door companies.

1

Research Multiple Companies

Get quotes from at least 3-5 companies. Compare not just prices, but what's included, warranties offered, lead times, and the quality of communication. Don't default to the first or cheapest option.

2

Verify Credentials

Check business licenses, insurance coverage, and professional affiliations. Look for membership in trade organizations like the Window and Door Manufacturers Association (WDMA). Verify their physical address exists.

3

Review Portfolio and References

Ask for photos of completed projects similar to yours. Request references and actually call them. Ask references about communication, timeline accuracy, quality, and how any problems were handled.

4

Visit Showroom or Workshop

Seeing their operation in person tells you a lot. Look for organization, quality of work in progress, and how staff answer your questions. If they won't allow visits, reconsider working with them.

5

Review Samples and Materials

Never finalize a purchase without seeing physical samples of finishes, glass options, and hardware. Photos on websites can be deceiving—colors, textures, and quality only reveal themselves in person.

6

Get Everything in Writing

Before signing, ensure every specification is documented in the contract: exact dimensions, materials, finishes, hardware, glass type, timeline, payment schedule, warranty terms, and procedures for handling defects.

The 72-Hour Rule

Never make a final decision the same day you receive a quote or visit a showroom. Give yourself at least 72 hours to review, compare options, and let any sales pressure fade. Rushed decisions are almost always regretted.

Protecting Yourself in the Contract

A thorough contract is your best protection. Before signing, ensure these elements are clearly addressed.

Essential Contract Elements

Contract Element What to Look For Red Flag if Missing
Detailed Specifications Exact dimensions, materials, finishes, hardware model numbers, glass type Generic descriptions like "premium hardware"
Price Breakdown Itemized costs for door, hardware, installation, delivery, taxes Lump sum with no detail
Payment Schedule Clear deposit amount, milestone payments, final balance terms Full payment required upfront
Timeline Estimated production time, delivery window, remedies for delays No timeline or vague "as soon as possible"
Warranty Specific coverage period, what's included/excluded, claim process Vague "lifetime warranty" with no details
Change Order Process How changes are requested, approved, and priced No change process defined
Cancellation Policy Conditions for cancellation, refund terms, restocking fees "All sales final" with no exceptions

Contract Clauses to Negotiate

  • Measurement Guarantee: If the company does their own measurements, insist they guarantee the fit. If the door doesn't fit due to their measurement error, they should remake it at no charge.
  • Delay Penalties: Request a clause that provides compensation or discounts if the door is delivered significantly past the promised date (e.g., 10% discount if more than 4 weeks late).
  • Inspection Period: Negotiate 48-72 hours after delivery to inspect the door before final payment is due. This gives you time to identify any issues before losing your leverage.
  • Dispute Resolution: Understand how disputes will be handled—mediation, arbitration, or court. Local arbitration is usually better than mandatory arbitration in a distant jurisdiction.
Never Sign Under Pressure

If a salesperson insists you sign immediately or lose a special price, walk away. Legitimate discounts will still be available tomorrow. High-pressure tactics are designed to prevent you from reading the fine print—always a warning sign.

Realistic Timeline Expectations

Understanding the custom door timeline helps you plan appropriately and recognize when promises are unrealistic.

Typical Timeline Breakdown

Consultation & Design: 1-4 Weeks

Initial meetings, design development, material selection, and finalizing specifications. Don't rush this phase—it sets the foundation for everything that follows.

Measurement & Approval: 1-2 Weeks

Professional measurement, creation of final drawings, and your approval of all specifications. Take time to review every detail carefully.

Production: 6-16 Weeks

The actual fabrication of your door. Complex designs, specialty materials, or busy seasons extend this phase. Iron doors and highly detailed wood doors take longest.

Finishing: 1-3 Weeks

Applying stains, paints, or clear coats. Multiple coats with proper curing time ensure durability. Rushing this step leads to finish failures.

Delivery: 1-2 Weeks

Shipping and logistics. Custom doors require careful packaging and often white-glove delivery. Distance from the manufacturer affects timing.

Installation: 1-3 Days

Professional installation, adjustment, and final inspection. Complex doors or challenging openings may take longer.

Timeline Red Flags

  • Promises of 4 weeks or less: Unless it's a simple design from stock materials, this is unrealistic for true custom work. They're either using pre-made components or cutting corners.
  • No production updates: Reputable companies provide progress updates or photos during production. Silence often means problems.
  • Frequent deadline extensions: One delay can happen; repeated extensions suggest disorganization or capacity problems.
  • Rush fees that seem too low: If expediting a complex door costs almost nothing extra, question what they're skipping.
Planning Tip

Start the custom door process 4-6 months before you need the door installed. This gives time for research, design refinement, production, and a buffer for unexpected delays. Rushed timelines lead to compromised decisions.

Managing Communication Throughout the Process

Clear, documented communication prevents misunderstandings and protects you if disputes arise.

Communication Best Practices

  • Get a single point of contact: Know exactly who to reach for questions and updates. Multiple contacts lead to conflicting information.
  • Document everything in email: Even after phone conversations, send a follow-up email summarizing what was discussed and agreed. Create a paper trail.
  • Request written confirmations: Any change to specifications, timeline, or price should be confirmed in writing before proceeding.
  • Establish update frequency: Agree upfront on how often you'll receive progress updates—weekly updates during production are reasonable.
  • Take photos: If visiting the workshop or receiving samples, photograph everything. Photos are evidence if disputes arise.

What to Do When Communication Breaks Down

First: Escalate Internally

If your contact isn't responding, request their supervisor's information. Sometimes issues are solved by reaching someone with more authority to make decisions.

Second: Send Formal Written Notice

A certified letter outlining your concerns and expectations creates legal documentation. Reference specific contract terms being violated.

Third: Review Your Options

Consult the contract's dispute resolution process. Consider whether mediation, arbitration, or small claims court is appropriate. Credit card chargebacks may be possible if paid by card.

Fourth: Share Your Experience

Honest reviews on Google, Yelp, and BBB help other consumers and often motivate companies to resolve issues. Be factual and documented in any public statements.

Delivery & Installation: Final Steps

The final phases are where many problems reveal themselves. Careful attention here protects your investment.

Pre-Delivery Checklist

  • Confirm delivery date and time window with both the company and your installer
  • Ensure the opening is ready—any framing, finishing, or prep work should be complete
  • Clear the path for moving a heavy, bulky door from vehicle to opening
  • Have someone available to inspect the delivery immediately
  • Know what's included—door, frame, hardware, threshold, weatherstripping, etc.
  • Have your contract ready to compare delivered specifications against order

Inspection Upon Delivery

Before signing any delivery receipt or releasing final payment:

  • Inspect for damage: Check all surfaces, corners, glass, and hardware for chips, scratches, dents, or cracks. Photograph any issues immediately.
  • Verify specifications: Confirm dimensions, finish color, hardware, glass type, and all details match your order. Don't assume—actually check.
  • Check all components: Ensure sidelights, transoms, thresholds, weatherstripping, and all ordered items are present.
  • Test operation: If possible, test the door's operation before installation to identify any mechanical issues.
  • Document condition: Photograph the door from all angles in good lighting as proof of condition at delivery.
Note Damage Before Signing

If you sign a delivery receipt stating the door arrived in good condition, you lose leverage for damage claims. Write on the receipt "Received with noted damage" or "Inspection pending" if you haven't had time to fully inspect.

Installation Day

  • Be present: Either you or a trusted representative should be on-site throughout installation to address questions and observe the work.
  • Verify installer qualifications: Confirm the installers are experienced with your specific door type. Ask about their recent similar installations.
  • Don't rush completion: A proper installation takes time. Rushed installers make mistakes that cause long-term problems.
  • Test everything: Before installers leave, operate the door multiple times, check the lock function, verify weatherstripping seals, and test any smart features.
  • Get documentation: Obtain a completed installation certificate, warranty activation (if required), and care instructions.
Final Payment Timing

Ideally, hold 10-15% of the payment until installation is complete and you've verified everything works properly. This small retention ensures the company stays motivated to resolve any final issues.

Summary: The Patient Buyer Wins

Purchasing a custom door should be an exciting experience, not a stressful one. The difference between a smooth process and a nightmare usually comes down to patience, research, and documentation.

Take Your Time

Rushed decisions lead to regret. Give yourself months, not weeks, to research companies, finalize designs, and place your order with confidence.

Do Your Research

Get multiple quotes, check references, visit showrooms, and verify credentials. The time invested upfront saves money and frustration later.

Trust Your Instincts

If something feels off about a company—pushy sales, vague answers, reluctance to provide references—trust that feeling and keep looking.

Document Everything

Written specifications, email confirmations, photos, and a detailed contract protect you when problems arise. Never rely on verbal promises.

A beautiful custom door that perfectly fits your home and lasts for decades is absolutely achievable. It just requires the discipline to slow down, ask questions, and make informed decisions. Your future self will thank you for taking the time to do it right.

Ready to Start Your Custom Door Journey?

Browse our gallery for inspiration, use our cost estimator to budget, and take your time finding the perfect door for your home.

Browse Door Designs

Related Resources

Continue your research with these helpful guides: